The 9th Edition (2026) Florida Building Code, Energy Conservation takes effect December 31, 2026, bringing major changes to residential energy compliance. For Florida builders using the R405 performance path,[…]

When an unexpected blower door testing requirement came up near final inspection, Stellar Building Performance helped C&D Construction keep this Rockledge project moving. We received the call around 9[…]

Stellar Building Performance recently completed blower door testing on a new home in the Belterra community of Port St. Lucie. Located in the growing south Tradition area near Becker[…]

Stellar Building Performance is proud to begin a new partnership with McKinney Construction supporting 17 high-end residential projects. The relationship begins with an impressive three-story luxury residence in South[…]

A three-story luxury residence in South Cocoa Beach achieved 2.19 ACH50 during blower door testing by Stellar Building Performance. The result led to an important mechanical ventilation discussion with[…]

A field update from blower door testing at Highpointe in Vero Beach, where two new construction homes tested below 3 ACH50 using spray foam insulation and dedicated fresh-air ventilation.

Blower door testing in Vero Beach brought me to another new construction home in the Lucaya Point community this week. I was onsite performing the field testing in partnership[…]

DeLeon Contracting needed blower door testing to move a new Port St. Lucie home toward its Certificate of Occupancy. The home achieved 4.07 ACH50 with a blown-insulation ceiling assembly,[…]

A blower door and duct leakage evaluation of an existing Port St. Lucie home uncovered significant return-side leakage. Infrared imaging and a follow-up smoke test helped isolate a retrofitted[…]